WorkSafeBC licensed AAL-00001339 · Insured · 24/7 emergency responseCall 604-725-4668
All Demo Solutions Ltd. logoAsbestos Abatement Servicesby All Demo Solutions Ltd. 604-725-4668
4.9 from 61 Google reviewsAsbestos Abatement

Pre-Demolition Asbestos Abatement in Metro Vancouver & the Sunshine Coast

Before a building is demolished, identified hazardous materials have to be removed.

Licensed AAL-00001339 · Insured · Free quotes · 24/7 emergency response
Asbestos containment with warning signage inside a home
4.9 ★61 Google reviews
AAL-00001339WorkSafeBC asbestos licence
24/7Emergency response
2 officesVancouver and Gibsons
The service

Pre-Demolition Asbestos Abatement

Before a building is demolished, identified hazardous materials have to be removed. All Demo Solutions abates the structure and supplies the clearance documentation that demolition contractors and municipalities require.

Asbestos was used in homes and commercial buildings across the Lower Mainland and the Sunshine Coast from the 1920s to the early 1990s. It can still be found in drywall joint compound, textured ceilings, vinyl flooring, vermiculite attic insulation, pipe wrap, roofing and stucco. When those materials are cut, sanded or broken during a renovation or demolition, fibres can become airborne. All Demo Solutions holds a valid WorkSafeBC Asbestos Abatement Licence (AAL-00001339) and removes these materials under containment before other trades start work.

Home taped off with asbestos hazard warning during removal
Two abatement technicians in protective suits
Scope

Asbestos Removal: what is included

  • Drywall, plaster and textured (popcorn) ceilings
  • Vinyl floor tiles and sheet vinyl flooring
  • Vermiculite attic insulation
  • Pipe insulation, boiler insulation and duct wrap
  • Roofing materials, window and roofing mastic
  • Exterior stucco, cement board and transite siding

Typical clients: homeowners preparing for a renovation, general contractors, builders and developers, property managers, strata corporations, commercial owners and real estate agents.

Process

How the job runs

Inspection, sampling and lab analysis

Suspect materials are sampled and analysed by a laboratory so the scope and the safest removal method are known before any work starts.

Containment and safe removal

Certified technicians build the containment, run HEPA-filtered negative air, remove the asbestos-containing materials and carry out air monitoring where the work requires it.

Clearance and documentation

The area is cleaned and inspected. You receive the documentation the scope calls for: WorkSafeBC notification, waste manifests and clearance or air clearance reports.

Google reviews

Customer reviews

We had a small job of removing asbestos tape. I inquired the cost of removal from a few companies. Mr. Dhesi was very cordial and he listened toe carefully and provided me the quote which was the most reasonable. He provided quick service, his team arrived…
HS S · Google review · 11 months ago
Mike and his team were absolutely amazing. Mike went above and beyond and gave us recommendations on asbestos testing companies and even came for the walk through with the other companies. Was able to communicate clearly with our framer on the requirements of…
Farhaan Assar · Google review · a year ago
Mike and his team did a great job for our asbestos removal. They were quick, cleaned up really well and also did a small amount beyond the scope of the original agreement. Highly recommended.
Stirling Duguid · Google review · a year ago

Read all reviews

FAQ

Pre-Demolition Asbestos Abatement: common questions

Do I need asbestos testing before a renovation?

If the building was constructed before the 1990s, testing is strongly recommended before any renovation or demolition. Drywall compound, ceiling texture, flooring, insulation and pipe wrap are common sources, and disturbing them untested creates health risks and project delays.

Is asbestos dangerous if I leave it alone?

Asbestos in good condition that is left undisturbed is not usually a hazard. The risk comes when the material is cut, drilled, sanded or damaged and fibres become airborne.

How long does asbestos removal take?

Small residential jobs are often finished in a day. Larger or more complex commercial and multi-unit projects can take several days including set-up, removal and clearance testing.

What paperwork do I get afterwards?

Depending on the scope: the WorkSafeBC notice of project, waste manifests, and a clearance letter or post-abatement air clearance report. These records are useful for strata councils, building permits and a future sale.

Do you offer free asbestos testing?

All Demo Solutions offers free asbestos testing and sampling on eligible new renovation projects. Call 604-725-4668 to find out whether your project qualifies.

Need it done safely and on schedule?

Call or text Mike's team for a free quote.